|
||||
|
Naypyidaw Airport, (Burmese: နေပြည်တော် အပြည်ပြည်ဆိုင်ရာ လေဆိပ်; previously known as Ela Airport), is located 16 km southeast of Naypyidaw, the capital of Myanmar. Before the foundation of Naypyidaw, this was referred to as the airport of the nearby town of Pyinmana. The airport is undergoing a major expansion project that will enable it to handle 3.5 million passengers annually by 2011. Expansion projectThe design of Naypyidaw International Airport was drawn by CPG Consultants Pte., Ltd. Of Singapore. The company drew the design of the annex to Yangon International Airport, and the designs of Changi Airport of Singapore and several airports of Vietnam and Laos. The construction work of the airport is carried out by Asia World Company. At the end of the master plan, the airport will have 2 runways and 3 terminals with modern facilities. The airport is planned to go according to the three phases. Phase 1 (2009- mid 2011)The phase 1 comprises
Annually, 2 million international passengers, 1.5 million local passengers totaling 3.5 million can use the main airport building which is made up of
The total area of the ground floor, the attic and the first floor of the whole building is 63,000 square meters. The airport building is a two-storey building with reinforced concrete boree piles. The ground floor is for passenger arrivals and the first floor for passenger departures. The west hall is for local passengers, the east hall, and the north hall for international passengers. The approach road to the airport with two ways / four lanes is 1500 meters long. The car parking measures 200 meters by 107 meters and its total area is 21,400 square meters. The 62- meter-high control tower can control all the construction tasks of the first, second and third phases of the project. Phase 2The second phase project includes an apron measuring 1200 feet x 1200 feet in front of the already-constructed airport building, an apron where VIP aircraft lands and building four more boarding bridges at the airport building for passengers, a flight catering building, a government complex and an airport maintenance base. Phase 3The third phase includes 17 more boarding bridges, a dual parallel taxiway measuring 1200 ft x 100 ft, a runway measuring 12000 ft x 100 ft in front of the airport building, a set of dual parallel taxiway measuring 12,000ft x 100 ft, four taxways measuring 650 ft x 100 ft, four taxways measuring 550 ft x 100 ft and an apron for cargo planes. After the third phase is completed, the airport will be able to cope with 10.5 million passengers annually and it will be more modern and sophisticated than Yangon International Airport and Mandalay International Airport. Airlines and destinations
The above content comes from Wikipedia and is published under free licenses – click here to read more.
The content above was published at Airports-Worldwide.com in 2010. |
|
Copyright 2004-2024 © by Airports-Worldwide.com, Vyshenskoho st. 36, Lviv 79010, Ukraine Legal Disclaimer |