Iloilo International Airport (Filipino: Paliparang Pandaigdig ng Iloilo, Hiligaynon: Internasyonal nga Hulugpaan sang Iloilo) (IATA: ILO, ICAO: RPVI) is the airport serving the general area of Iloilo City, the capital city of the province of Iloilo and the regional center of the Western Visayas region in the Philippines. It opened its doors to commercial traffic on June 14, 2007 after a decade of planning and construction, replacing Mandurriao Airport in Iloilo City proper which had been in service for over seventy years. As a result, the new airport inherited its IATA and ICAO airport codes, as well as its position as the fourth-busiest airport in the Philippines, from its predecessor. Despite being called an "international" airport, it is officially designated as a Class 1 principal (major domestic) airport by the Civil Aviation Authority of the Philippines, the body responsible for the operations of all airports in the country. In addition to being the first airport in both Western Visayas and the island of Panay to be built to international standards, it is considered one of four international airports in the Visayas. The airport is located 19 kilometers (12 mi) northwest of Iloilo City on a 188-hectare (460-acre) site in Barangay Duyan-Duyan, split between the municipalities of Cabatuan, where the airport proper is located, and Santa Barbara, where the airport entrance and access road are located. The airport complex consists of a single runway, various administrative and maintenance buildings, waste sorting and water treatment facilities, a power generating station, a cargo terminal and a main passenger terminal. Its location on the Tomas Confesor Highway, a major highway transversing the island, makes the airport accessible from all parts of Iloilo and Panay by road, while its proximity to the currently defunct Panay Railways network could potentially link the airport to the rest of Panay by rail. Built in slightly over 30 months, Iloilo International Airport is one of the largest airports to be constructed in the Philippines. At its inauguration, President Gloria Macapagal-Arroyo remarked that the airport was the most beautiful and modern in the country and called it a symbol of both political will and economic maturity. HistoryThe situation at Mandurriao Airport
Prior to the construction of Iloilo International Airport, Iloilo City was served by Mandurriao Airport in Iloilo City proper, which had been in operation since 1937. Though continually expanded in order to accommodate the changing demands of the city throughout much of its history, Iloilo City's rapid urbanization had made this feat impossible by the 1990s. The 2,202-square-meter (23,700 sq ft) terminal building, constructed in 1982 to handle the passenger demands of a single airline (Philippine Airlines, being the Philippines' aviation monopoly at the time), was unable to cope with the liberalization of the Philippine aviation industry and the subsequent boom in air travel, when as many as four airlines served the airport at the same time and where the passenger terminal needed to have an area of at least 7,800 square meters (84,000 sq ft) in order to absorb all peak-hour demand. The airport's problems continued to linger with it into the new millennium. The increasing incidence of terrorism in the Philippines for example forced aviation officials to restrict airport access only to passengers, the sealing of doors and windows at airport terminals being an essential component thereof. However, the airport's architecture (which took advantage of natural ventilation) and lack of air conditioning made the airport's pre-departure and arrival areas very uncomfortable for passengers to stay in. To counteract this, the Air Transportation Office (the forerunner of the Civil Aviation Authority of the Philippines) installed six air-conditioning units at the pre-departure area. Although the installed units were able to provide a degree of comfort to passengers, the ATO recognized that their efforts were inadequate: in order to effectively provide a comfortable environment for passengers throughout the entire terminal building, twenty-three air conditioners needed to be installed. Passenger complaints meanwhile were not limited to just the lack of air conditioning: despite the existence of a baggage X-ray machine, passengers flying other airlines were forced to have their baggage manually checked as the machine was ostensibly for the sole use of Philippine Airlines passengers. In addition to problems with the terminal building, both the airport's location and surrounding infrastructure were the subject of much complaint as well. For one, although some 1,700 cars visited the airport daily, the parking lot had only 129 slots, and could not be expanded any further. The airport complex likewise was located directly alongside major city thoroughfares, in particular the city's main highway, the Tomas Confesor Highway, which complicated the flow of traffic in and around the area. At one point, the ATO, which was already having difficulty managing vehicular traffic around the airport, proposed banning cargo and delivery trucks from passing through the road in front of the terminal building. However, the city government did not respond. Beset with a myriad of problems, authorities eventually concluded that a new airport had to be built outside the city, and thus Iloilo International Airport was born. Planning and constructionIn October 1995, the Iloilo city government announced its intention to construct a new airport outside the city in cooperation with the private sector. A year later, the Department of Transportation and Communications (DOTC) announced its intention to construct a new airport in Iloilo with German assistance, originally to serve as a reliever for a larger airport to be built in Silay City, Negros Occidental (which would later become the New Bacolod-Silay Airport). Although two sites were initially proposed: north of the city in Santa Barbara and south of the city in the province of Guimaras, the ATO decided to keep the airport in Iloilo, citing the lack of demand in Guimaras to justify construction there. The Regional Development Council for Western Visayas (RDC) endorsed the project to the National Economic and Development Authority (NEDA) in July 1997. Despite the endorsements, the NEDA, citing an internal rate of return below the set "hurdle rate" of fifteen percent and the impossibility of acquiring some 415 hectares (1,030 acres) of land for the project in one year, rejected the airport proposal in February 1998, and the project was subsequently excluded from the 1998 development cooperation program of the German government. Concurrent though with the planning of the new airport, the Japan International Cooperation Agency (JICA) initiated a study on the master planning and long-term development plans of four key domestic airports in the Philippines. The report cited Mandurriao Airport, Bacolod City Domestic Airport, Legazpi Airport and Daniel Z. Romualdez Airport in Tacloban City as these key domestic airports, noting the high growth of passenger and cargo volume there and the eventual need for expansion. Heeding the recommendations of the JICA report, President Joseph Estrada signed a memorandum in November 1998 creating the Iloilo Airport Coordinating Committee, headed by Iloilo-born senator Franklin Drilon. The coordinating committee decided that a new airport was needed for Iloilo City as Mandurriao Airport was deemed unexpandable due to operational obstacles and the presence of slums and other natural and civic structures that would restrict expansion efforts. In addition, the committee, objecting to the idea that the new airport would serve merely as a reliever for the new Bacolod airport, successfully lobbied for an international airport to be built in lieu of a domestic one. The project finally received NEDA approval in March 2000, with Cabatuan as the location of the new airport based on a study performed by both the DOTC and the JICA later that year. Although multiple funding sources were originally considered by the NEDA to fund the airport's construction, it was decided that the project should avail of an official development assistance facility offered by the Japanese government through the then-newly formed Japan Bank for International Cooperation (JBIC). After almost two years of negotiations, and after initially refusing to bankroll the project, the JBIC extended a 6.2 billion peso (US$152 million) loan to the Philippine government in August 2000. The Iloilo International Airport project was inaugurated by President Gloria Macapagal-Arroyo on January 25, 2004, and construction work on the new airport started on April 14 that year. The original expected deadline of completion was June 2007, although this was moved to the first quarter of 2007. A joint venture between the Taisei Corporation and the Shimizu Corporation of Japan served as the contractor for the project, with Phil-Japan Airport Consultants, Inc. managing the project and serving as the government's consultant to the project. The project was 75 percent complete as of July 14, 2006 and fully complete by March 18, 2007. While construction was completed ahead of schedule, the airport was constructed over budget, with a final cost of around 8.8 billion pesos ($201 million) caused by increases in the cost of civil works and consultancy services. NameDuring construction, the airport was officially called the New Iloilo Airport Development Project, or NIADP. However, as the airport was nearing completion, there were three main contenders for the airport's name: Iloilo International Airport, the original name of the airport which had the support of the Iloilo provincial and city governments; Panay International Airport, proposed by the President and supported by the RDC, which at the time was led by Antique governor Salvacion Perez; and Graciano Lopez-Jaena International Airport, named after the Iloilo-born Graciano López Jaena, proposed by the Dr. Graciano Lopez-Jaena Foundation with the support of the RDC and Antique governor Perez, who is also a member of the foundation, and endorsed by the National Historical Institute. Out of the three proposals, the name Panay International Airport was dropped due to opposition by the Iloilo city and provincial governments, the mayor of Cabatuan and Justice Secretary Raul Gonzalez, all citing that it is illogical to rename an airport after an island as large as Panay. Prospects for Graciano Lopez-Jaena International Airport are better, with Iloilo governor Niel Tupas saying that the feasibility of renaming the airport after López Jaena or any other Ilonggo should be studied first. Local newspaper The News Today issued an informal survey asking Iloilo City residents what should be the name of the airport and why. Although the survey is non-scientific, a plurality of the nineteen respondents suggested that the name be kept as Iloilo International Airport. Inauguration and start of operations
Iloilo International Airport was originally scheduled to open on March 19, 2007, when its inaugural flight would land; however, this was moved to April 16, with commercial operations commencing on April 21. This date was likewise scrapped due to the inability of the President to attend because of the hospitalization of First Gentleman Jose Miguel Arroyo, with a new date scheduled for sometime in late April. Some sources indicated that the airport would open on May 10, 2007 during a major TEAM Unity rally in Iloilo City that President Arroyo was expected to attend, although this date was not considered in favor of a date after the 2007 elections, specifically in June, in order to avoid political overtones from dominating the airport's opening. The final date chosen for the airport's inauguration was June 13, 2007, with commercial services commencing the next day. By that time, airlines had already transferred their offices to the new airport. The airport was formally opened on June 13 with the arrival of the presidential aircraft at the new airport at around 9:50 am PST, with Governor Tupas leading provincial and city officials in welcoming the President to the new facility. The inauguration of the new airport also included figures such as Japanese ambassador Ryuchiro Yamazaki and Transportation and Communications Secretary Leandro Mendoza, who assisted the President in leading the inaugural rites. The facility itself was formally commissioned at 5:00 am PST on June 14, coinciding with the simultaneous decommissioning of Mandurriao Airport. The first commercial flight to land at the new airport was Air Philippines Flight 987, a Boeing 737-200 that departed from Ninoy Aquino International Airport (Manila) and landed at 6:05 am PST the same day. Operations on the first day of the airport's commercial activity ran smoothly, although a baggage conveyor belt and X-ray machines malfunctioned due to a sudden surge in passengers trying to catch their early morning flights. Some tension marred the airport's first day after baggage porters who worked at the old airport insisted on working at the new airport. The ATO, DOTC and the porters have since agreed to a closed-door conference and later on to refer the problem to DOTC Assistant Secretary Red Kapunan, the person in charge of international airports in the Philippines. StructureRunwayIloilo International Airport has one primary 2,500-meter (8,200 ft) runway 45 meters (148 ft) wide. The runway runs at a direction of 02°/20°, the same as Mandurriao Airport. Unlike the runway at Mandurriao, the longer runway at Iloilo International Airport can support aircraft as large as the Airbus A330 and Boeing 767. Runway lights and an Instrument Landing System were installed, making the airport capable of supporting low-visibility and night landings. TerminalsPassenger terminalThe airport has a 13,700-square-meter (147,000 sq ft) main passenger terminal designed to accommodate around 1.2 million passengers annually. Believed to be one of the most beautifully-designed airport terminals in the Philippines, its architectural style is said to be reminiscent of Hong Kong International Airport, albeit on a smaller scale. It is divided into three levels: arrivals and baggage claim on the first floor, check-in on the second floor and departures on the third floor. The pre-departure area at Iloilo International Airport has a capacity of 436 passengers. Three jet bridges protrude from the terminal above a 48,000-square-meter (520,000 sq ft) apron, enabling Iloilo International Airport to handle up to six aircraft simultaneously. When fully extended, the jet bridges stretch to a length of 35 meters (115 ft). The terminal is equipped with six X-ray machines, as well as escalators and staircases for departing and arriving passengers' use. There are also two elevators, one for very important persons and one for disabled passengers. Two pocket gardens have been installed at the terminal, one each for both the departure and arrival halls. The building features ten modern check-in counters with LCD monitors. The terminal makes extensive use of natural lighting, designed for energy efficiency. Other amenities available to passengers include a special smoking room, a VIP lounge, a Mabuhay Lounge for Philippine Airlines business class passengers and counters for hotel and car rental bookings, as well as areas for airport stores and payphones. Cargo terminalIloilo International Airport has a 1,281-square-meter (13,790 sq ft) cargo terminal, designed to handle up to 11,500 tons of cargo annually. The three-storey building, built in an architectural style similar to that of the main terminal building, has a covered platform, bathrooms, government offices and cargo handling areas, as well as its own parking lot. Airline offices also occupy the structure, secured by means of a perimeter fence with a guard house. Other structuresIloilo International Airport has a modern 35-meter (115 ft) tall control tower equipped with air navigation equipment and radar systems. A briefing room for pilots is found inside the control tower. Additionally, the airport complex has a fire station equipped with three fire trucks, a maintenance building, a mechanical building and an administrative building. In front of the passenger terminal is a 415-slot parking lot for the use of passengers, employees and airport visitors. The airport has a power back-up system and a power generating station that enables the airport to run in the event of a power outage, returning the supply of electric power to the facility within three seconds. The airport has water treatment facilities and a 6-hectare (15-acre) man-made pond used for flood control and drainage purposes as well as for the irrigation of nearby farmland. A waste treatment and sorting facility on the airport grounds converts solid waste into fertilizer for the use of surrounding farms. Airlines and destinations
No airline has operated international routes to and from Iloilo, and proposals for the launching of international flights have yet to materialize. At the time of its opening, the ATO believed that international flights out of and to the airport might not begin until 2008, although international passenger flights could commence once Iloilo International Airport meets ICAO standards. A study is currently being conducted on the feasibility of the airport serving international flights. The DOTC plans to stage international cargo flights out of the airport, as sixty percent of Philippine seafood exports come from Panay. Japan and Hong Kong have been cited as potential first destinations of these cargo flights. On January 31, 2008, the Iloilo city government announced that Cebu Pacific was considering starting international services from Iloilo, initially with a route to Hong Kong to cater to the large number of Overseas Filipinos there. Philippine Airlines later announced its intent to serve this route as well, suggesting that Iloilo tourism authorities mount thrice-weekly charter flights to the city using PAL Airbus A320 aircraft. City government officials also believed that the opening of a Cathay Pacific office in Iloilo City may bode well for future service to Hong Kong. In addition to Hong Kong flights, the Center for Research and Communication of the University of Asia and the Pacific has called for flights from Iloilo City to Japan, South Korea and mainland China. PAL Express, a subsidiary of Philippine Airlines, is considering a direct route from Iloilo to Malay to boost Boracay-bound tourism traffic. A resolution passed by the Iloilo City Local Development Council (ICLDC) called on PAL president Jaime Bautista to institute direct flights to Malay from Iloilo, with onward service to Cebu City on the return portion from Malay. However, PAL has questioned the route's feasibility, citing congestion at Godofredo P. Ramos Airport which serves that municipality. Access and transportationRoad
Iloilo International Airport is connected to Iloilo City proper via the Tomas Confesor Highway. At Bangga Dama in Santa Barbara, a bypass branches from the highway, leading to a 3-kilometer (1.9 mi) long, 30-meter (98 ft) wide access road which links the airport complex to the highway. The access road is wide enough to be able to accommodate four lanes of traffic. The estimated travel time to the airport from Iloilo City proper is around thirty minutes. To relieve crowding on the main access road during peak hours, a 3.2-kilometer (2.0 mi) secondary access road is being constructed, connecting the airport to Cabatuan proper. The 124 million-peso ($2.6 million) road is expected to improve connectivity between the airport and both northern Iloilo and southern Capiz, as well as reduce travel times from there to the airport by fifteen minutes. Public transportationAlthough public transport routes to and from the airport are being studied, no franchises for transport services to the airport have been granted yet by the Land Transportation Franchising and Regulatory Board (LTFRB). Some transport operators, however, are showing interest in starting shuttle services to the airport from Iloilo City, while others have drawn proposals for public transport routes from Iloilo City directly to the airport. A shuttle service is currently available to the airport from Iloilo City, with pick-up and drop-off points at SM City Iloilo and Jaro Plaza. Taxi service is available to the airport from Iloilo City proper, with the average fare from Jaro Plaza in downtown Iloilo City costing around 163 pesos ($3.90) as of 2007. However, taxi operators have filed a petition with the LTFRB to increase airport rates by 150 pesos, a move opposed by Governor Tupas as it would make taxi fares to the airport the most expensive out of any route going to an airport in the Philippines, as well as hurt the tourism industry. Iloilo International Airport is accessible via jeepney to Santa Barbara town proper, after which travelers may take a share taxi to the airport. Travelers may also take jeepneys en route to Cabatuan, Calinog or Janiuay, all of which stop at Santa Barbara. RailA train linking Iloilo International Airport to Iloilo City proper, similar to the Airport Express in Hong Kong and similar systems in other cities, has been proposed. A study to determine the feasibility of a train service has since been commissioned by the city government. Other proposals to connect the airport to the city via rail include the revival of the currently defunct Panay Railways network which has a station in Santa Barbara town proper. The above content comes from Wikipedia and is published under free licenses – click here to read more.